Agent Lab Test Recap: How We Score
Prepared Wed Nov 25 2026, ET.
How we score
Each run of the test set is scored in this order:
- Pass/fail. Did the agent deliver what was asked? Every literal requirement (length, format, count, names, dates) is checked against the output. A missed requirement is a FAIL.
- Quality (1–5). A review of the finished deliverable: 5 = ready to ship, 3 = usable with fixes, 1 = unusable.
- Time. Wall-clock minutes from start to delivered output.
- Cost. Total spend for the run (LLM, helpers and media), taken from the usage log, not estimated.
Quality is only compared between runs that pass. A failed run is not rescued by good quality, time or cost.
Example results (made-up)
These three rows are invented to show the format. They are not real results.
| Example | Pass/fail | Quality (1–5) | Time (min) | Cost (USD) |
|---|---|---|---|---|
| Example A (made-up) | PASS | 4 | 12 | 0.35 |
| Example B (made-up) | PASS | 3 | 7 | 0.18 |
| Example C (made-up) | FAIL | 5 | 9 | 0.22 |
Example C fails despite the highest quality, so it ranks below A and B.
Notes
- The 15-task set itself is not documented here. I searched memory, the project notes and the past conversation history and could not find a written list of the 15 tasks or their exact pass criteria. The recap therefore describes the scoring method only. The task list should be added once it is confirmed.
- Quality scale anchors (1, 3, 5) and the time and cost definitions above are the working definitions I found in past notes; they have not been confirmed by Rick.
- Costs should always come from the usage log (
usage --conversation), never from an estimate. - All times on this page are Eastern (ET).