Motion Studio UI test — why jobs never reach running
Test window: Mon Nov 23, 2026, 2:55 AM – 3:55 AM ET · site: transovo.ai (app commit d8aea723, /api/health ok) Result: BLOCKED. Cancellation could not be exercised against a running job, because no Motion Studio job reached running at any point in the test window.
What the 4 Custom-flow attempts did
All four were created through the real UI (Motion Studio → New → Customize, choices picked, fields filled, Start clicked). Every setting was taken from the Custom form:
| # | Created (ET) | Project | Custom settings | Job status path | Outcome |
|---|---|---|---|---|---|
| 1 | 2:59:02 AM | msp_5431a89f… |
documentary · 30 s · cinematic · 16:9 · 480p · no brand | queued → dispatched cycles → failed (cycles not logged) | failed 3:06:17 AM (7.2 min) |
| 2 | 3:08:07 AM | msp_c9988a96… |
logo animation · 15 s · luxury · 9:16 · 480p · no brand | queued → dispatched cycles → failed (cycles not logged) | failed 3:15:17 AM (7.1 min) |
| 3 | 3:16:05 AM | msp_d53bb21a… |
explainer · 15 s · minimalist · 1:1 · 480p · no brand | queued → dispatched cycles → failed (cycles not logged) | failed 3:23:17 AM (7.1 min) |
| 4 (final) | 3:24:12 AM | msp_0347c7dc… |
explainer · 15 s · cinematic · 16:9 · 480p · no brand | queued 3:24:30 → dispatched 3:26:26 → queued 3:26:33 → dispatched 3:27:23 → queued 3:27:35 → failed 3:32:20 | failed 3:32:17 AM (8.0 min) |
All four were started from the same “idea” workflow and differed only in the Custom settings (video type, duration, style, aspect ratio) — every combination failed the same way, so no particular option is the cause.
Every one ended with the identical job message:
“Production could not be resumed after repeated worker interruptions.”
progress stayed 0 and phase stayed research for the whole life of each job. events: [] (zero stage events) on all four.
Why running is never reached
- The queue hands the job out, but nothing executes it. Status cycles
queued → dispatched → queuedabout once a minute.dispatchedmeans the control plane assigned the job to a worker; the job is then returned toqueuedbecause that worker never recorded a lease/progress event. After a couple of such cycles the watchdog gives up and marks itfailed(two full dispatch/requeue cycles in the one attempt whose polling was logged). - The queue UI says it outright. The job page’s status line while queued is literally “Waiting for an available producer” (the panel’s own copy for
status === "queued"). - Zero stage events recorded. A healthy job logs events as it moves (
"Researching the story…" 8%,"Writing the script…" 22%, …). These four logged none. The last job in the account that recorded any forward progress at all wasmsp_ccd25309…, whose last event was Sun Nov 22, 5:28 PM ET (“Building the edit: titles, graphics, captions”) — it then also failed. - No job has completed since Sun Nov 22, 12:05 AM ET (
msp_df5596c9…, “Your video is ready”). Eight jobs created since Sun Nov 22 4:00 PM ET; seven have zero events, one has four. - One job is stuck
runningfor three days.msp_df813b3b…(created Fri Nov 20, 2:50 PM ET) still reportsstatus: running,phase: fixing,progress: 90, last update Fri Nov 20, 3:38 PM ET — it has sat inrunningfor ~64 h with no timeout. So the cleanup that should reap orphaned jobs is not firing either; the only state transition that does fire is the dispatch-retry →failedwatchdog. - The failure is time-boxed and deterministic: on tonight’s four attempts it took 7.1–8.0 min. On the four Sun Nov 22 evening jobs the same watchdog ran 85–93 min before failing. Same message, same phase, same progress 0 — consistent with a worker/producer fleet that accepts dispatch but never runs (no capacity, crashed producer, or a bad producer version), not with bad input.
Conclusion: the Motion Studio producer/worker tier is down (or unreachable) for this account. Jobs are accepted, dispatched and retried by the control plane, but never executed, so they are killed by the “repeated worker interruptions” watchdog while still at phase: research, progress: 0.
Why no cancel could be proven here
The Cancel control is not available at any of the states this job reached:
- The workspace Cancel button (
data-testid="ms-cancel") is rendered only when the project status isplanning,producingorexporting. Tonight’s projects never leftsetup— confirmed both in the DOM (cancel button present: Falseon the final job page) and in the API ("status": "setup"). - The agent job panel (
data-testid="ms-agent-job",delivery: "legacy") has no cancel control at all — its only buttons are “Open in Editor” / “Export” once complete. - So there was nothing in the UI to click: the job is dead (
failed) before any state that offers Cancel.
Attempted proof path (and an incidental finding): POST /api/motion-studio/projects/{id}/cancel accepts a cancel even on an already-failed job — HTTP 200 — and then rewrites the project record: status: setup → failed, error: "Cancelled.", stage story → failed with error "Cancelled.", activity "Cancelled by you.". The page then shows a red “Production was cancelled…” banner next to a red “Failed” badge with “Production could not be resumed after repeated worker interruptions” still beneath it. That is a state-consistency bug worth fixing (a cancel should not overwrite a failure record with a cancellation, and the two banners contradict each other). It proves the endpoint is wired, but it is not proof that cancelling a running job stops it — no running job existed.
Evidence files
out/evidence/transitions_032408.log— second-by-second status log of attempt 4 (created → queued/dispatched cycles → failed → post-failure polling).out/evidence/proj_*.json— full project documents for all four attempts (settings, stages, activity).out/evidence/all_jobs.json,recent_jobs.json,jobs_with_events.json— every project’s job status/phase/event counts (46 projects).out/evidence/health.json—/api/healthresponse.shots/before_cancel_032408.png— final attempt 10 s before failure: queued, “Waiting for an available producer”, stage 1, 0:00/01:00.shots/proof_failed_job.png— the same page after failure: “Production request needs attention / Production could not be resumed after repeated worker interruptions / Production paused”, no Cancel button in the header.
Suggested next step for the team
Check the Motion Studio producer worker fleet (last known good run: Sun Nov 22 12:05 AM ET; last stage event from any job: Sun Nov 22 5:28 PM ET) and the dispatch/lease watchdog that emits “Production could not be resumed after repeated worker interruptions”. Once a job reaches planning/producing, the Cancel path can be tested end to end in a couple of minutes.